2023年4月14日 星期五

你見過一條河流過另一條河嗎?

 Have you ever seen a river over a river? AMAZING.....

 
你見過一條河流過另一條河嗎? AMAZING.....
Even after you see it, it is still hard to believe!Water Bridge in Germany . What a feat!
Six years, 500 million Euros, 918 meters long . . . now this is engineering!
This is a channel-bridge over the River Elbe and joins the former East and West Germany ,As part of the unification project. It is located in the city of Magdeburg , near Berlin .The photo was taken on the day of inauguration . . .
To those who appreciate engineering projects, here ' s a puzzle for your armchair engineers. . . and physicists.
Question:
Did that bridge have to be designed to withstand the additional weight of ship and barge traffic,Or just the weight of the water?
Answer:
It only needs to be designed to withstand the weight of the water!
Why?
A ship always displaces an amount of water that weighs the same as the ship, regardless of how heavily a ship may be loaded.
> > > > More . . . .
即使你看到它,它仍然是很難相信!水橋在德國。什麼的壯舉!六年來​​500萬歐元, 918長。  。現在這是工程!這是一個通道橋在易北河和加入前東德和西德,由於部分項目的統一。它位於城市馬格德堡附近的柏林。該照片攝於當天的就職典禮。  對於那些誰欣賞工程項目,這裡有一個難題的工程師為您的扶手椅  。和物理學家。問題:難道是橋樑設計必須承受額外的重量船舶和駁船運輸,或者僅僅是重量的水?答:它只需要設計承受重量的水!為什麼呢?船舶總金額取代水的重量一樣的船,無論怎樣嚴重的船舶可裝載。>>>>更多。   
 
The Elbe-Havel and Mittelland canals had previously met near Magdeburg but on opposite sides of the Elbe . Ships moving between the two had to make a 12-kilometer detour, descending from the Mittelland Canal through the Rothensee boat lift into the Elbe, then sailing downstream on the river, before entering the Elbe-Havel Canal through Niegripp lock. Low water levels in the Elbe often prevented fully laden canal barges from making this crossing, requiring time-consuming off-loading of cargo.
易北河 - 哈維爾運河和Mittelland此前會見了馬格德堡附近,但對立雙方的易北河。兩者之間的船舶移動不得不作出一個 12公里長的彎路,降從 Mittelland運河船隻通過 Rothensee電梯到易北河,然後順流河上,在進入易北河 - 哈維爾運河通過 Niegripp鎖。低水位在易北河往往使運河駁船滿載作出這條通道,需要耗時卸貨物
Construction of the water link was started as early as in the 1930s but due to the World War 2 and subsequent division of Germany the work remained suspended till 1997. The aqueduct was finally completed and opened to the public in 2003. 建水的聯繫始於早在20世紀 30年代,但由於​​第二次世界大戰和隨後的分裂德國的工作依然暫停,直到1997年。該渡槽終於完成,向公眾開放於 2003年。
 